Home > News

Improve the productivity of concrete batching plant

2018-08-29 13:54:24

 Improve the productivity of concrete batching plants

75 Plant.jpg

 
Three time nodes
 
Feeding time, mixing time and discharging time are the three time nodes that affect the production efficiency of the mixing plant.
 
First of all, the user should regularly check the butterfly valve and related electrical components during use to ensure that the mechanism runs smoothly and the connection between the powder hopper and the mixer is smooth and the normal feeding time is guaranteed;
 
Secondly, the user should check the integrity of the blade liner inside the mixer, the location of the raw materials to be delivered, the delivery time period, whether there is a phenomenon of holding the shaft affecting the mixing effect and time;
 
 
Again, the discharge time is generally reduced by increasing the capacity of the discharge hopper or designing the discharge hopper as a storage container.
 
In the end, the user should allocate enough transport vehicles based on the production capacity and transport distance of the commercial station, so as not to produce too much commercial concrete without timely transportation, which will affect the progress of the project.
 
Therefore, we must constantly maintain and manage the equipment at the commercial station so that the equipment can be in the best working condition. In the daily maintenance, we can promptly check the existing safety hazards and eliminate it, so as to ensure the safe and efficient operation of the commercial concrete station.