Home > News

Drum Concrete mixer Handling Precautions

2016-01-07 15:21:37

1. The hopper can only shake tube discharge is completed, in order to enhance the return to positive turn after feeding.
2. loading hopper generally not be delegated, when special circumstances require decentralized, with brakes must slow decline.
3. In order to reduce the phenomenon of sticky material hopper, to order feed hopper should be: gravel, cement, sand or sand, cement, gravel.
4. On the feeding process, to promptly add water to reduce the mixing time and reduce dust emissions.
5. hopper rises, forbids any person to stay in the bottom of the bucket, empty bucket decentralization should be slow.
6. The non-random non jzc350 drivers operating handle and button.
7. NOTE Electrical safety, to prevent electrical components, wire and moisture and damage.
8. When a power outage, you can use the crank pulley rocker swing, will mix the material discharge barrel.
9. When the warning light is on, there is a limit switch has lost its effect, should be replaced or repaired.
middle_201502130513204414.jpg