Concrete mixer operation notice
2016-05-25 18:01:37 1. Concrete mixer should be set in the flat position, use the wood up front and rear axles, the tire is put aside high overhead, so as not to walk in when the.
2. Concrete mixer should implement the secondary leakage protection, before going to work, after power on, must be carefully checked by the empty turn try think qualified, just can use.Commissioning should check when mixing drum speed whether appropriate, under normal circumstances, the proportion of empty car speed car was faster (after loading) 2 ~ 3, such as the difference is more, should adjust pulley and the proportion of the driving wheel.
3. Checking whether the transmission clutch and brake is flexible and reliable, wire rope is damaged, track pulley are in good condition, surrounded by accessibility and lubrication situation of each part.
4. When the completion of concrete mixing or stop 1 is expected to excess stock out of the net, stones and water to pour into shaking inside the cylinder, turn on, put the glue on the cylinder of the mortar all discharged after rinse.Can not have water in the cylinder to avoid cylinder and leaf rust.At the same time also should clean up the dust outside mixing drum, make machinery clean intact.
PRODUCT TYPE LIST
NEWS
Contact Us
Address:Industrial Equipment Zone,Zhengshang Road Zhengzhou Henan
Zip: 450000 China
Fax:+86-371-63935058
E-mail:sales@unique-cons.com
TEL:+86-371-63699132