Concrete mixing station in the wiring when debugging matters needing attention
2016-08-17 18:41:10Concrete mixing station main body equipment installation, wiring debugging will be needed.Commissioning stage in wiring must grasp the good parts of debugging, because may be "extremely important".So, in the process of concrete mixing station installation, mastery of detail is very important.So, concrete mixing station in the wiring when debugging matters need to pay attention to what?
1, in the concrete mixing plant commissioning, first check the power supply voltage, capacity, is in line with the requirements, whether there is leakage protection devices, equipment whether there is a short circuit, leakage, mix within the cylinder, the belt can not have impurities.
2, ma chine requirements are personnel left the scene, the debugging personnel one operator, one observation implementation agencies, two people must ensure that the good communication.
3, when the machine running deviation of the belt can be adjusted, the body will try to stay away from the body.Adjust the other facilities should be without electricity, and by the specialist care.Adjust gas path, maintenance should also be empty when the power is compressed air after risk.
4, before each launch concrete mixing plant equipment must ring the bell warning shots, and by the inspection personnel can start only after tour.
5, concrete mixing plant outage or repair, set no material stock in the hopper and prevent the air pressure is released to the host, cause unnecessary trouble and danger.
PRODUCT TYPE LIST
NEWS
Contact Us
Address:Industrial Equipment Zone,Zhengshang Road Zhengzhou Henan
Zip: 450000 China
Fax:+86-371-63935058
E-mail:sales@unique-cons.com
TEL:+86-371-63699132