Concrete Mixer Truck
2016-10-05 17:20:381. Hydraulic system pressure should comply with the instructions for use, and shall not be adjusted. Hydraulic oil and fuel oil should comply with the original requirements.
2. Before loading concrete mixers, you should drain the remaining water and mix barrel debris.
3. The ambient temperature is above +25 degrees Celsius, from the loading, transport and unloading to the duration shall not exceed 60 minutes, the ambient temperature is below +25 degrees Celsius above shall not exceed 90 minutes.
4. Winter construction, should be fully implemented: the power before checking whether the ice; when work seriously exclusion barrel and mix the remaining water supply system, turn off the pump switch, the control lever in the "stop" position.
5. At the construction site after the discharge is completed, immediately rinse with a hose mixer comes into the hopper, the hopper, discharge chute, etc., remove sludge adhered to throughout the body and concrete.
6. Timely removal and outside the mixing tube and the contamination of slag concrete blocks remaining, as well as into the barrel when the machine repair personnel repair and welding work, you must first turn off your vehicle engine
7. In operation, can not reach into the rotating mixing barrel, put his hand entered the prohibited discharge chute and discharge chute extension joints in order to avoid accidents.
8. Stirring blades should be checked regularly for wear and timely repair and renewal.
PRODUCT TYPE LIST
NEWS
Contact Us
Address:Industrial Equipment Zone,Zhengshang Road Zhengzhou Henan
Zip: 450000 China
Fax:+86-371-63935058
E-mail:sales@unique-cons.com
TEL:+86-371-63699132