Electric safety of concrete mixing station
2017-05-31 15:10:18 Electric safety of concrete mixing station
1, the total distribution box near the power supply, the total distribution box to the main distribution box, the main distribution box to switch box each units shall not be greater than 30 meters.Switch box should grasp within 3 meters distance from electrical equipment.
2 it is forbidden to use the land to the construction site, concrete mixing station as zero.Protect the zero line installed switch or fuse, and laying alone, not for it.
3, implement site suspension system of signs and warning signs, and take the corresponding protective measures.
4, regularly to staff popularization safe sense.
5, field distribution box use, maintenance, cleaning, defensive cover, implementing centralized management responsibility.
PRODUCT TYPE LIST
NEWS
Contact Us
Address:Industrial Equipment Zone,Zhengshang Road Zhengzhou Henan
Zip: 450000 China
Fax:+86-371-63935058
E-mail:sales@unique-cons.com
TEL:+86-371-63699132