Concrete mixing station installation time need to pay attention to what issues?
2017-06-14 16:54:11Concrete mixing station installation time need to pay attention to what issues?
Before the installation of concrete mixing station, installation personnel familiar with drawings and relevant technical documents, carefully select the appropriate lifting equipment, and according to the lifting equipment, determine the installation plan.Installation personnel should do well in all parts of the component count and repair work.On the deformation and damage of components, must carry on the calibration and repair.
Concrete mixing plant is ready to install with the lifting equipment should be based on the main roof height, mixing platform assembly quality elevation and weighing platform and the platform where the assembly quality and the platform where the elevation is equipped with, choose suitable lifting equipment.
Concrete mixing plant machinery and equipment after the installation, should with electric control system of attachment.After inspection and correct by the mechanical and electrical personnel to debug.Debugging, during normal operation record ingredients time, weighing accuracy, and concrete technical parameters are measured.For a variety of data, subject to upon the acceptance of the user, before formal production.
PRODUCT TYPE LIST
NEWS
Contact Us
Address:Industrial Equipment Zone,Zhengshang Road Zhengzhou Henan
Zip: 450000 China
Fax:+86-371-63935058
E-mail:sales@unique-cons.com
TEL:+86-371-63699132