Talking about what needs to be noticed during installation for Concrete mixing station

2018-01-12 13:47:37

 Talking about what needs to be noticed during installation for Concrete mixing station

5.jpg

 
(1) The ground screw of the cement silo in the concrete mixing station is poured into the foundation reserved pit. While adjusting the center line of the cement silo bracket coinciding with the basic center line, the above four flanges are adjusted on the same horizontal plane (measurement method: theodolite Or 8-10 diameter transparent plastic hose plus color water measurement method), that is, the choice of concrete pouring.Precast pit pouring concrete grades should be higher than the basic level of concrete used in winter construction, in order to shorten the construction period, the concrete used should be added early antifreeze. Concrete to be solidified 5-7 days before the installation of cement warehouse, cement warehouse installation, the need to use theodolite vertical measurement of the warehouse of cement, the verticality of one thousandth of the height. In order to shorten the construction period, in the infrastructure, it is also possible to use the embedded parts instead of the anchor bolts to fix the cement silo or the mixer.
 
(2) Installation of mixing console in concrete mixing station: The bottom plane of the mixer chassis should be properly lifted, and the legs should be connected with the mainframe by hinges. After the cement scale, water scale and admixture scale are installed, it can be lifted and measured And adjust the chassis to make it in a horizontal state, the centerline of each leg coincides with the centerline after the anchor bolts can be poured into the reserved pit (or the base and the pre-buried parts of the welding).
 
(3) Installation of other parts of the concrete mixing plant: After the installation of the main machine and cement silo in the concrete mixing plant, the screw conveyor can be installed. Before lifting, check the lubrication points to fill the oil and grease, Test, found that the problem solved in time, the batcher part of the installation, according to the requirements of the basic map in place, small batching machine placed on a solid foundation pier plane, large batching machine requires pouring anchor bolts, the mechanical part of the installation is complete After checking all lubrication points of various equipment, add oil (winter in the northeast to replace the lubricant suitable for low temperature conditions) or grease, you can according to the instructions and the electrical schematic wiring requirements and empty running test.