What is Foundation-free mixing plant?
2025-02-27 15:33:39I. Product Definition and Core Value
It is a modularized mobile mixing plant that does not require traditional concrete foundation construction, and is supported by the steel structure frame as a whole to realize quick installation and flexible transfer.
1.2 Core Value Proposition
Save time and money: save more than 30 days foundation construction time, reduce 30%-50% civil construction cost
Flexible and efficient: ready to install and use, meeting the needs of temporary works and short-term projects.
Environmental compliance: zero damage to the foundation, reducing the waste of land resources.
II, Six core features analysis
2.1 Revolutionary structural design
All-steel module frame: compressive strength ≥25MPa, service life of more than 15 years.
Pre-assembled components: 80% assembled before leaving the factory, and ready to be used after on-site lifting and docking.
2.2 Extremely fast deployment capability
72 hours of production: compared with the traditional mixing plant's 3-month construction cycle.
No hardening requirement: level ground can be installed, adapting to sand, mud and other complex terrain.
2.3 Intelligent control system
PLC full-automatic production: proportioning error ≤1%, capacity 60-240m³/h optional.
Remote monitoring: mobile phone/computer real-time view of production data.
2.4 Super mobility
Containerized module: support highway transportation standard, reduce 70% of transit cost.
Fast dismantling and assembly: professional team completes the whole station relocation in 3 days.
2.5 Green configuration
Pulse dust removal system: dust emission concentration ≤20mg/m³.
Sewage recycling device: zero wastewater discharge
2.6 Safety guarantee system
Three-level anti-tipping design: automatic leveling + ground anchor fixation + stress monitoring
Lightning protection and grounding system: passed the national lightning protection testing and certification.
III. Customer Value
3.1 Cost saving
Saving about 150,000-300,000 RMB in infrastructure cost
Exemption from paying deposit for land hardening of traditional mixing plant
3.2 Efficiency Improvement
Shorten the project start-up cycle by 90%
Supports multi-site recycling, increasing asset utilization rate by 3 times.
3.3 Risk Avoidance
Avoiding the risk of demolition due to incomplete land procedures
No permanent structures, easier to pass environmental approvals
IV. Application Scenarios
4.1 Short-term project preference
Highway maintenance ▏Railway emergency ▏Post-disaster reconstruction
Municipal projects ▏Railway rescue ▏Disaster reconstruction
4.2 Special terrain solutions
Island construction ▏Mine construction ▏Ecological protection zone
Temporary commercial concrete supply stations
V. Frequently Asked Questions
Q1: How is the stability of the equipment guaranteed?
It adopts military-grade welding process + dynamic load simulation test, 8-level seismic verification, and 3000-hour fatigue test certified by CMA.
Q2:Can we customize the configuration?
We provide modularized combination of aggregate silo (2-4 silos), cement silo (1-3 silos), and mixing mainframe (forced/double horizontal axis).
Q3: Is the post maintenance complicated?
Equipped with IOT early warning system, the key components adopt quick-disassembly design, and the maintenance time consuming is reduced by 60%.
VI. Core Parameter Table

Now factory direct shipment, 10% discount for a limited time!
【Consult Now!】
Email: sales@unique-cons.com
Whatsapp:+86 133 8403 5767
Website:https://www.unique-cons.com
#concretemixingplant #concreteconstruction #concretemixingstation #concretemixingmachinery #concrete #cement #concrete_mixer #concrete_plant
PRODUCT TYPE LIST
NEWS
Contact Us
Address:Industrial Equipment Zone,Zhengshang Road Zhengzhou Henan
Zip: 450000 China
Fax:+86-371-63935058
E-mail:sales@unique-cons.com
TEL:+86-371-63699132