Concrete batching plant before commissioning checks and preparations:
1.Check the grease of the various parts of the adequacy of the good debugging must be observed mixing barrel four shaft end seal plate at grease overflow.
2.Check the various parts of the installation, connection bolts are tightened, the chain connection is reliable.
3.Check the configuration of the pneumatic system is normal discharge door is in the closed position
4.Check mixing barrel if there is a foreign body, fastening liner, leaves again, mixing arm bolts to prevent shedding.
5.Check its support of the electrical system is normal.
6.check its support of the water supply, aggregate, powder system is normal.
7. Mixer blade with liner gap is not greater than 5mm, gap larger than required at any time to adjust the case of normal production, host liner 37000 times, leaves after 25,000 times need to be replaced, the control room grounding resistance of 4 ohms.