D. once blocked bags, compartment pressure exceeds the warehouse roof safety pressure relief valve pressure, the pressure relief valve to open releasing compartment pressure and prevent warehouse explosion accidents.
E. Through high and low material level can be observed in full and the lack of material warehouse.
F. when discharge is required, first open the manual discharge valve at the bottom of the cone, and then the cement out of conveying means conveying cement. In the process of discharge, if has the " bagging " phenomenon , the timely broken arch pressing solenoid valve to perform the blowing , eliminating the " camber " in the feed , to ensure smooth supply of cement .
G. When the cement delivery device fails, the first close discharge cone at the bottom of the manual valve to prevent cement spill, resulting in waste .

4. Notes of cement silo
A. The installation process, the non warehouse body tilt, leg deformation.
B. The bottom of the legs and basic welding firmly embedded parts.
C. Good wind, lightning work.
D. Strictly prohibit strong impact leg and body positions.
E. Regular inspection of cement dust bag attachment, and timely clean-up.
F. The foundation must be solid, consistent architectural design specification.

5. Production notes
A. The company produced a storage bin in line with industry standards.
B. Unloading height 1.96m, 4.2m, can also manufacture according to user requirements.
C. Cement silo (cement tank ) capacity of 50t, 65t, 80t, 100t, 150t, 200t, 250t, 300t, 500t , etc.