1. Concrete mixer not overload.Operation in non-maintenance, non-grilled material tool into the mixer. In case of the half-way power outage, the material must be unloaded.
2.Compulsory mixer aggregate particle size required to allow the value of the feed, prohibited the use of large aggregate.
3.The sand heap compaction pound pine, two people, one person to operate a guardianship, must stand in a safe and secure place, and security measures. Non-blind adventure job.
4. Mechanical operation, non-head or hand inserted into the hopper with the rack the View or Tanmo job.
5.Cleaning tank must be located to supervise hang warning signs.
6.bucket elevator, non-operating under the hopper or walk through. Pit when the clean-up bucket, hopper hanging double insurance hook after prison before cleanup.
7.Transport mixer should apply for permits, the required speed driving, traction generally may not exceed 20kW / h. 8.Human transfer, before the downhill should be turned to the rear brake set up special command, close coordination and coherence.